The block , crank and head have been loaded up to go for machining this week. The block will go to the machine shop we use at work. The head will go to Radtec for welding and then up to the machine shop to be milled and the head face skimmed to ensure flatness when mating to the block face.
www.radtec.co.uk – The place to go for alloy rads, intercoolers, bespoke fuel tanks, oil catch tanks and all other alloy fabrications. Speak to either of the Darrens or Keith and they will put you right! – +44 1543 502525